TG3 Considering the energy options at concept stage

15:35 - 16:30

How to get building service engineers to consider these points early – this is where the industry is failing – understand the options at concept stage.

  • Procurement – taking the key considerations into account
  • Considering renewables options and the FiT
  • How to reduce ongoing costs
  • Delivering energy savings via great fabric and form
  • Low energy services with cost optimised controls
  • What should engineering firms be saying to their clients post-PC?




« Back to previous page